THEATER ARMY
TAMMC
TAMCA
TAACOM
PETROLEUM AND WATER
GROUP
MMC
PETRL PL&
TRANS BN
WATER
TEAM OP
SUPPLY
BN
BATTALION
1
AREA SPT
WATER
GROUP
SUPPLY
COMPANY
S&S BN
PETRL SUP
LOGISTICS
*WATER
TRANS MDM
BN
TASK FORCE
ELEMENTS
TK CO
2
TACTICAL
QM SUP CO
QM SUP CO
WATER
(DS)
(DS)
DISTR TEAM
*WATER
*WATER
WATER PURIF
ELEMENTS
ELEMENTS
TEAM/DET
* Prior to establishment of a water supply battalion
1 When the magnitude of the water mission requires large scale water capability
2 Ad hoc task organization
Figure 1-2. Theater army water supply structure.
Early deployment of CSS water units can be expected in arid regions. This is necessary because of the
increased consumption requirements, limited availability of aircraft for aerial resupply, and the need for
centralized production. Centralized production will be near the shore or offshore; tank trucks for distribution
will be required early on. The purification teams and detachments needed to operate barges and other high-
capacity ROWPU equipment, as well as water supply companies that operate potable water storage and
distribution systems, will appear early in most TPFDL.
1-4
QM 4924