SITUATION: You are supervising soldiers filling the SMFT.
4.
Which action is required before starting to fill the tank?
A.
Purge air from both the tank and the supply hose.
B.
Attach the pressure gauge to the filler/discharge valve and open
the pressure gauge valve.
C.
Have all the bolts in the fittings tightened.
D.
All of the above.
5.
No pressure will show on the pressure gauge until the tank is filled
how high?
A.
1
foot.
B.
2
feet.
C.
3
feet.
D.
4
feet.
SITUATION: You are supervising soldiers filling the FAWPSS drums.
6.
How many soldiers are required to fill the FAWPSS drums?
A.
One.
B.
Two.
C.
Three.
D.
Four.
SITUATION: You are supervising the movement of water to a forward location
by FAWPSS. Two drums are being filled by your soldiers. You go forward to
the location designated for the systems at the isolated unit.
7.
During your survey of the forward site, you should check for what
principal items?
A.
A flat, solid, debris-free area, 30 by 120 feet, with adequate
terrain drainage and free of overhead obstacles.
B.
C.
Sufficient space for turnarounds and turnabouts.
D.
Sufficient quantity of raw water.
1-13