LESSON 7
DIRECT THE ASSEMBLY, OPERATION, PMCS, AND DISASSEMBLY OF THE HEAVY EXTENDED MOBILITY
TACTICAL TRUCK (HEMTT) TANKER AVIATION REFUELING SYSTEM (HTARS)
Critical Task:
101-519-3317
OVERVIEW
Due to the extreme hazards associated with refueling aircraft in a theater of operations and the stringent quality
requirements of aviation fuels it is imperative that all HTARS systems be properly maintained, assembled, and
operated.
Lesson Description:
This lesson covers the procedures for directing the assembly, operation, PMCS, and disassembly of the HTARS
system.
Terminal Learning Objective:
Action:
The soldier will learn to select an HTARS site, supervise the assembly, operation, PMCS, and
disassembly of the HTARS system, observe fire and safety precautions, and identify
environmental considerations.
Condition: Given subcourse QM 5094.
Standards: The soldier must score a minimum of 70 percent on the end of subcourse examination.
7-1
QM 5094