PART B - VERIFYING PMCS ON PUMPS
Supervising Before Operation Maintenance.
Ensure fuel tank is filled if necessary and checked for secure mounting.
Ensure air cleaner cup is checked for quantity and condition of oil. Service if necessary.
Ensure fuel strainer bowl is checked for dirt and water. Service if necessary.
Ensure fuel lines and fittings are free of leaks. Tighten fittings to correct leaks.
Ensure oil level is checked. Add oil if necessary.
Ensure engine and pump rotation is checked for free rotation.
Ensure suction hose is checked for collapsed walls and signs of leaking. Replace a damaged hose.
Ensure fire extinguishers are present and in working condition.
Ensure chock blocks are used as appropriate.
Ensure grounding rods are used as required.
Supervising During Operation Maintenance.
Ensure personnel check discharge hose for leaking hose or fittings. Replace a damaged hose.
Ensure personnel check hose nozzle for leaks and faulty operation.
Supervising After Operation Maintenance.
Ensure fuel tank is filled if necessary and checked for secure mounting.
Ensure that personnel clean and store the equipment.
2-4
QM 5098