Overview - Qm4916a0004PlanningSite ConditionsFigure 1-1 shows a completed DA Form 1712-R. It documents test results and gives a sketch of the area.EnvironmentSelection of the Most Suitable SitePractice Exercise - Qm4916a0010Practice Exercise cont'd - Qm4916a0011Practice Exercise Answer Key and Feedback - Qm4916a0012Analyze Water Analysis Test ResultsFigure 2-1 shows DA Form 1712-R. Table 2-1 shows the maximum allowable water source constituents for Army water purification units.Table 2-1. Maximum allowable water source constituents for Army water purification units.Verifying product waterScenarioFigure 2-2. DA Form 1713-R, Daily Water Production Log--ROWPU (front side).Figure 2-3. DA Form 1713-R, Daily Water Production Log-ROWPU (back side)Table 2-2. Water quality standards for long-term consumption (more than 7 days) and short term consumption (7 days or less).Figure 2-4. DA Form 1714-R, Daily Water Issue LogFigure 2-5. DA Form 1714-1-R, Daily Water Distribution LogPractice Exercise - Qm4916a0023Practice Exercise cont'd - Qm4916a0025Practice Exercise Answer Key and Feedback - Qm4916a0026Analyze Entries on Water Reports, Logs, and Forms Introduction Figure 3-1. DA Form 1713-R, Daily Water Production LOG--ROWPU (front side)Figure 3-2. DA Form 1713-R, Daily Water Production Log--ROWPU (back side)Figure 3-3. DA Form 1714-R, Daily Water Issue LogFigure 3-4. DA Form 1714-1-R, Daily Water Distribution LogFigure 3-5. DA Form 5456-R, Water Point Inspection (front side)Figure 3-6. DA Form 5456-R, Water Point Inspection (back side)Practice Exercise - Qm4916a0035Practice Exercise Answer Key and Feedback - Qm4916a0036Monitor Water Operations