LESSON 2
PRACTICE EXERCISE
The following items will test your knowledge of the material covered in this lesson. There is only one correct
answer for each item. When you complete the exercise, check your answers with the appropriate answer key at
the end of this subcourse. If you answer any items incorrectly, go back to the part of the lesson that contains the
information involved and study again.
1. The pipeline of the IPDS is configured in what length pipeline sets?
A. 19-foot.
B. 20-foot.
C. 5-mile.
D. 10-mile.
2.
What is the maximum allowable operating pressure for the TPT?
A.
350 psi.
B.
210 psi.
C.
200 psi.
D.
150 psi.
3. The beach interface is an assembly of adapters to connect IPDS to what?
A. PSE.
B. OPDS.
C. TPT.
D. AFFF.
4. How often does the water detector kit need to be tested when the dispensing assembly is in operation?
A. Every 2 hours.
B. Every 3 hours.
C. Every 4 hours.
D. Every 5 hours.
5. What is the first step in site and route selection?
A. Survey using topographic map.
B. Preliminary plot plan.
C. Roadway and berm construction.
D. Mark the pipeline trace