PRACTICE EXERCISE
The following items will test your grasp of the material covered in this
lesson. There is only one correct answer for each item. When you complete
the exercise, check your answers with the answer key that follows. If you
answer any items incorrectly, study that part of the lesson which contains
the portion involved.
1. What should be done at the water point before you position the trailer
and unload the equipment?
A.
Determine
the position of the components
B.
Determine
C.
Check the
D.
Check the
quality of the water at the source
2. After starting the generator, what reading should be obtained on the
A.
220 VAC
B.
440 VAC
C.
50 Hz
D.
60 Hz
3. What
symbol
is used
to
identify the
polyelectrolyte containers
and
bottles?
A.
Triangle
B.
Circle
C.
Square
D.
Letter "P"
4.
When are "routine shutdown to stand-by" procedures used?
A.
For
shutdowns
of
three
hours or more
B.
For
shutdowns
of
three
hours or less
C.
For
shutdowns
of
three
days or more
D.
For
shutdowns
of
three
days or less
5. How are the system components packed on the ROWPU when preparing for
movement?
A.
First piece off is the last piece on
B.
First piece off is the first piece on
C.
According to the schematic drawing
D.
1-25
QM4911