LESSON 1
Supervise the Setup/Dismantle of the 600-GPH ROWPU
101-540-2015
101-540-2030
101-540-2031
OVERVIEW
This lesson discusses the proper procedures for supervising site selection;
the setup of the raw water, backwash, chemical, product water systems; and
dismantling of the 600-GPH ROWPU.
You will learn the placement of the
strainer, hoses, pumps, and tanks.
TERMINAL LEARNING OBJECTIVE:
ACTION:
You will supervise site selection,
the
setup,
and
the
dismantling of the 600-GPH ROWPU.
CONDITION:
You will be given information from TB MED 577 and TM 10-
4610-240-10.
STANDARD:
You
will
supervise
600-GPH
ROWPU
setup/dismantle
operations,
insuring
that
the
soldiers
can
operate
according to the current doctrine.
REFERENCES:
The material contained in this lesson was derived from the
following publications: FM 10-52-1, TM 10-4610-239-10, TM
5-6115-465-12, STP 10-77W24-SM-TG, and TB MED 577.
INTRODUCTION
Setup and dismantling of the 600-GPH ROWPU affects mission performance. You
cannot produce potable water in a safe and sanitary manner if you setup
improperly.
As a supervisor, you must be able to guide your soldiers
through the correct procedures.
The lives of the soldiers you support
depend on your success in the mission.
1-1
QM4913